Registration in short. WA's registration rules are set out on our page for Perth builders. In brief, building work that needs a building permit and is worth $20,000 or more ($50,000 or more for a Class 10a building such as a garage, shed or carport) has to be carried out by a registered building contractor, and section 8 of the Building Services (Registration) Act 2011 requires a registered contractor's advertising of its services to carry its registration number. Whether a particular job needs a permit is for the local government's permit authority to confirm, so a concreter's site should state the registration the business holds, if any, and claim nothing beyond it. Consumer Protection WA's advice to people hiring tradespeople shapes what owners expect from you too: get at least three written quotes, pay only a small deposit, generally no more than 10 per cent of the price, and know that builders can't ask for more than 6.5% on building contracts between $7,500 and $500,000.
The state rule behind the crossover subsidy. Regulation 15 of the Local Government (Uniform Local Provisions) Regulations 1996 makes a council that approves or requires the first crossing to a property bear 50% of the cost of a standard crossing, as the council estimates it, provided the crossing is standard or better, and each council decides what counts as standard. That's why the subsidy works differently across the metro area. The City of Stirling wants a crossover approved before it's built, accepts claims from the property owners only, within 12 months of installation, and calculates the amount from the crossover's length times a standard 3 m width at its current rate for plain grey concrete 100 mm thick, plus an amount for each splay, then halves it; it says payments aren't based on what the contractor charged. The City of Joondalup makes a one-off payment towards the first crossover or the replacement of an old bitumen one, with the request due within six months of construction. The City of Cockburn's crossover policy, adopted on 2 September 2025, defines its standard crossing as plain grey concrete at least 3 m wide at the boundary, caps its contribution, and pays nothing towards extra crossovers or changes to existing ones.
Specifications change from one council to the next. Joondalup doesn't need an application to change an existing crossover, though the work must follow its guidelines; it will check a plan or sketch within 10 to 15 working days, allows a single crossover up to 6 m wide, wants a mountable or apron kerb between crossover and road in grey pre-mix concrete with no exposed aggregate or colour, and keeps grey concrete footpaths running unbroken through the crossover. The City of Canning's residential crossover information sheet, last updated in August 2022 and still linked from its crossovers page, accepts brick paving, grey concrete or exposed aggregate, says liquid limestone isn't acceptable, asks for the application at least ten working days before work starts, and ends with a post-completion inspection; if the inspector has concerns, pavers can be lifted in any three places to check the sub-base. The City of Kwinana's specification puts concrete and poured limestone under one heading, calls for 25 MPa at 28 days, at least 100 mm deep on a base compacted to 95% of maximum dry density, with a broom finish, and, where the lot sits above a kerbed road, has the crossover rise at 2% from the top of the kerb to the boundary. It also warns that if the driveway inside the boundary goes in before the crossover without the boundary levels being obtained from council, the owner may have to alter that driveway at their own expense.
Drainage, meters and poles. The City of Gosnells says each lot has to manage its own stormwater without affecting the neighbours, that soakwells, which empty into the surrounding sand, are needed under all paved areas, with concrete soakwells preferred, that the base of a soakwell must sit at least 0.5 m above the maximum groundwater level, and that clay or silty sites use sealed tanks instead. Water Corporation's requirements for a relocated meter say the pipework is not to be encased in brick paving or concrete, and moving a meter takes a licensed plumber to relocate the internal pipework plus a water service application through BuilderNet. Cockburn's policy keeps crossovers at least 1 m from street lights, power poles and stay wires and 2 m from bus stops, and tells owners to allow at least four months where Western Power has to move something. On the cutting side, WorkSafe WA lists concrete cutting, angle grinding and jackhammering among the jobs that create respirable crystalline silica dust, and points to wet cutting or local exhaust ventilation to bring it down.
Where you pour, and how we work. Perth's metropolitan region takes in 30 local governments, each with its own crossover paperwork, so a service-area section is most useful when it names suburbs alongside their councils: Hillarys and Kingsley in Joondalup, Scarborough in Stirling, Willetton in Canning, Atwell and Success in Cockburn, Wellard in Kwinana, Thornlie and Southern River in Gosnells. The quote form can then tell you whose specification applies before you ring back. We're an Adelaide team at Ste 3/110 Hutt St and work with Perth businesses by phone and email. Adelaide is 1.5 hours ahead of Perth, or 2.5 while South Australia is on daylight saving. We haven't built a site for a concreter yet, or for any business in WA, so the examples below come from South Australia.