Website Design for Tradies in Rockhampton

Websites for Rockhampton electricians, plumbers, roofers, carpenters, fencers and other trades that say which side of the Fitzroy you work, whether you head out to Gracemere, Mount Morgan or the Capricorn Coast, and what storm, flood and new-home work you take on.

What a Rockhampton trade website should cover

Rockhampton is a river city with a north side and a south side, a growing town to the west at Gracemere, and a stretch of coast to the north-east that belongs to a different council. Add the Fitzroy's floods and the cyclones that occasionally reach this far south, and a trade site has a few local questions to settle.

  • The north side and the south side, by name

    The two halves of the city are joined by two road bridges and a rail bridge, and locals place themselves by side. We list north-side suburbs such as Norman Gardens, Parkhurst, Kawana and Frenchville apart from south-side ones such as Allenstown, Wandal, The Range and Depot Hill, then add Gracemere and Mount Morgan if you go there.

  • The Capricorn Coast as its own entry

    Yeppoon and Emu Park have been in Livingstone Shire, a separate council, since 1 January 2014, and the Yeppoon area added 440 residents in 2024–25. If you drive out to the coast, name the towns and say whether there's a travel charge, because people there search by their own town names.

  • Flood-prone streets described without planning advice

    Council's planning scheme maps flooding from the Fitzroy and from local catchments, and the overlay maps are on its Rock e Plan site. Builders, electricians and plumbers can describe the work they do in low-lying homes, such as moving switchboards and hot water systems up, and link to council's tools instead of quoting flood levels.

  • Storm work ready before the next cyclone

    Marcia crossed Rockhampton as a category 3 system in February 2015 and damaged hundreds of homes and businesses. Roofers, glaziers, fencers and tree services can keep a storm-repair section with a photo-upload form, and we move it to the top of the home page when you email us.

  • Growth at the north end of town

    Parkhurst – Kawana grew 2.3% in 2024–25, faster than any other part of the Rockhampton council area, and Glenlee – Rockyview, just over the boundary in Livingstone Shire, grew 3.9%. People settling into homes there need fences, driveways, patios, solar, air conditioning and landscaping, and a line naming those suburbs shows you already work at that end of town.

  • Work in the old city centre

    Many of the CBD's historic buildings, particularly along Quay Street, are on the Queensland Heritage Register, and they need painters, electricians, roofers and shopfitters too. If that's part of your work, show those jobs with the street name; approvals for heritage places are the owner's business, so leave them off the site.

Rockhampton conditions behind the advice

Licensing is set statewide, so a Rockhampton trade follows the same rules as one in Brisbane: QBCC licences for builders, plumbers and most other trades, electrical contractor licences for sparkies, and licence details in every ad, which takes in your website and social pages. Our Brisbane tradies page lists what has to be shown, and we place it in the footer of each page we build.

Rockhampton Regional Council was created on 15 March 2008 from the City of Rockhampton and the shires of Fitzroy, Livingstone and Mount Morgan. After a referendum on 9 March 2013, Livingstone became its own council again on 1 January 2014, taking Yeppoon and Emu Park with it. What remains covers about 6,570 km², with an estimated 85,794 residents in June 2025, up 624 in a year, and a median age of 37.7, slightly younger than the national 38.4. Gracemere alone had about 13,300 people. Livingstone, on the coast, grew faster: 2.1%, to 43,668. The region also borders Isaac, Central Highlands, Woorabinda, Banana and Gladstone.

The Fitzroy shapes a lot of local repair work. Its highest recorded flood, in January 1918, reached 10.11 m, and in January 2011 it peaked at 9.2 m. Low-lying suburbs south of the CBD are among the most exposed: Port Curtis was almost entirely under water in early January 2011, and Depot Hill is badly exposed because it sits so close to the river and so low. Council has since updated its Fitzroy River flood overlay mapping, refreshed local catchment mapping for North Rockhampton and Gracemere, and added new mapping for South Rockhampton and Mount Morgan. The planning scheme and its overlay maps are on council's Rock e Plan site, and that's the link a trade site should give owners.

Rockhampton lies just north of the Tropic of Capricorn, and cyclones do reach it. Marcia made landfall near Shoalwater Bay on 20 February 2015 as a category 5 cyclone and had weakened to category 3 by the time it crossed the city, where winds over 150 km/h were recorded; more than 60,000 homes lost power across Yeppoon, Rockhampton and Bundaberg. Rockhampton is listed for the Stronger Homes Grant for homes flooded in the severe weather from 24 December 2025. The grant pays for work such as raising switchboards, hot water systems and air conditioner condensers, flood-resilient floors and fibre cement wall linings, done by a suitably licensed Queensland contractor, and applications close on 30 November 2026.

The city is also in the middle of a major road project. The Rockhampton Ring Road runs 14.7 km from the Capricorn Highway at Fairy Bower, through Pink Lily, to the Bruce Highway at Parkhurst, with a new four-lane bridge over the Fitzroy. It's a $1.98 billion project, and the government says 976 girders for its 17 bridges are being made locally. Beyond construction, the city's economy has its strengths in health, tourism and agriculture, with a meatworks at Lakes Creek and Stanwell Power Station about 30 km west. We're an Adelaide team and work with Rockhampton trades by phone and email, so nobody waits on a meeting: you send your licence number, suburbs and photos, and we send back a draft to check.

Trade sites we've built

We haven't built for a Central Queensland trade yet. Western Sydney Stump Grinding takes emergency work after storms, and SA Painting Professionals sets out a large service area region by region, which is how a Rockhampton site would handle both sides of the river and the towns beyond.

Home page of the Western Sydney Stump Grinding & Tree Removal website

Western Sydney Stump Grinding & Tree Removal

Trades & construction · Western & Greater Sydney

Family-owned tree service in Western Sydney doing stump grinding, removals and 24/7 emergency work. A single page with two quote forms, tap-to-call throughout, reviews and a service-area list, set up for the calls that arrive together after a storm.

“Rebuilt two websites for our businesses and saved us a fortune on hosting etc. Nothing is ever a problem, will email back on a Saturday night if need be.”

Lockyer Valley Batteries, Google review

★ 5.0 from 33 Google reviews (opens in a new tab)

Want numbers from a trade site? Western Sydney Stump Grinding has landed at least 62 jobs, about $46,500 of work, from a single-page site we built. Read the case study.

See all 14 recent client sites in our portfolio.

What a Rockhampton trade website costs

One page

$399

One page: services, north-side and south-side suburbs, Gracemere and the coast if you go, licence details, photos, a quote form and tap-to-call.

Up to 3 pages

$899

Home and services pages, plus a storm and flood page with a photo-upload form and the resilience jobs you do.

For trades covering both sides and beyond

Up to 8 pages

$1,499

A page per service, pages for the north side, the south side, Gracemere and Mount Morgan, and the Capricorn Coast, a gallery and a storm and flood page.

  • Payment. No deposit. We build your draft first, you ask for as many changes as you like, and you pay once you approve it. If you don't go ahead, you owe nothing.
  • GST. WebCraft Studio isn't registered for GST, so no GST is added.
  • Timing. Most sites are live within 5–10 days of us getting your words and photos; bigger sites (up to 8 pages) take 2–3 weeks.
  • Hosting. After launch, hosting is $30 a month: hosting, security monitoring, backups, email support and unlimited text and image changes on your existing pages. New pages or features are quoted first. No contract, cancel anytime.
  • Domain and email. We register your domain in your name (about $20 a year), connect it to your site and set up your business email.

See full pricing and what each package includes

Questions from Rockhampton tradies

Should a Rockhampton trade site mention Yeppoon and Emu Park?

Only if you work there. They've been part of Livingstone Shire, a separate council, since 2014, and people on the coast search by their own town names. If you charge for the drive out, say so on the page so nobody is surprised by the quote.

We're based on the north side. Will south-side customers still call us?

Name the south-side suburbs you'll travel to and the site makes that clear. People mostly want to know you'll cross the river without fuss, and a line on how you schedule jobs on each side answers it.

Should our site explain flood levels to customers?

No, leave that to council. The flood hazard overlay sits in the planning scheme, and owners can view its maps on council's Rock e Plan site. Describe the work you do in flood-prone homes and link to council's tools rather than quoting levels yourself.

Can we promote Stronger Homes Grant work on the site?

Yes, if you hold the right licence and do the eligible works. Name the jobs, link to the Queensland Government's grant pages, and leave eligibility questions to the owner and the program, since the rules and dates are theirs to change.

Can an Adelaide team build a website for a Rockhampton trade?

Yes. WebCraft Studio is an Adelaide (South Australia) web design team at Ste 3/110 Hutt St, working with businesses Australia-wide by phone and email, and our current clients are in SA, NSW, VIC and QLD. We send a draft link, you reply with changes, and there's no deposit.

How quickly can a storm notice go up on the site?

We reply within 24 hours, and if the site already has a storm section we move it to the top as soon as we see your email. Text changes on your existing pages are covered by hosting at $30 a month.

Start your Rockhampton trade website

Tell us your trade, which side of the river you're based on and how far you travel, whether you take storm or flood work, and send your licence number with some job photos. We'll quote and build the draft, and you only pay when you've approved it.

We reply within 24 hours. Prefer email? info@webcraftstudio.com.au